It’s not very bright, but we have a light at the end of the tunnel. It’s one of those small weak light bulbs that you put in an ugly accent lamp from Kirkland’s. I’d like to have a spotlight, attached to a Chevy 4x4 truck with a case of beer in the back. But at this point, I’m not going to be picky. Kirkland’s will do.
The IDIOT trim carpenter’s are at the house now, installing the baseboards, door jams, bookshelves, and beautiful crown molding. The painters are scheduled to finish painting tomorrow. Then all of the tile will be installed in the bathrooms and kitchen, the granite countertops will go in, and lastly, the wood floors will be sanded and refinished. After that, it’s just fixture and appliance installations and finishing touches.
What did you say? That shouldn’t take that long? Ha! Yeah right. I hired Frank, remember? And I’ll bet money on it that he’ll find a way to make this a long and painful process.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment